Another productive day on the deck expansion

Framing grill
The framed in areas are for the kitchen.  The island on the left will have a bar area on the left and a work table on the right with a sink, cutting board and storage.  The other framed area on the right (along the wall) will be where the gas and charcoal grills will be located.  There will be an exhaust hood over the grill area.

Bobcat1
Glen, driving the BobGlencat, brings in another load of gravel while Joe Furlong and others wait to spread it out.

Steps
Mike Green and Joe Rieker work on covering the steps in the plastic lumber.

Workarea
The patio is almost ready for a layer of sand and the pavers which will cover the surface.